Goldshore Resources – Initial Holes of the 100,000 meter Program hits Widespread Gold Mineralization at Moss Lake Gold Project




Korelin Economics Report show

Summary: The first 3 holes of the 100,000 meter program were released each hitting gold mineralization over long widths, including 57meters at 1.2g/t gold, 36meters at 1.15g/t gold, and 31meters at 1.09g/t gold