Summary: F-35 fighter jets are expected to be delivered to Vermont in 2019, but as President-elect Donald Trump mentioned in his press conference last week, there have been cost overruns and scheduling delays in the production of the fighter jet.
Summary: F-35 fighter jets are expected to be delivered to Vermont in 2019, but as President-elect Donald Trump mentioned in his press conference last week, there have been cost overruns and scheduling delays in the production of the fighter jet.